Case Studies
State / Local Government Case Studies

Alexandria Sanitation Authority
The Alexandria Sanitation Authority’s (ASA) main wastewater treatment facility is a 54 million gallon/day, high tech, wastewater treatment plant. The Authority had recently completed a $250 million plant upgrade and was looking for additional energy cost saving measures.

Arlington County
The Arlington Initiative to Reduce Emissions (AIRE) has set a goal of reducing the county’s emissions by 10% from 2000 to 2012. AIRE is looking to reduce the county’s impact on the environment while it encourages county citizens and businesses to do the same

City of Baltimore
Baltimore’s City Hall was built in 1875 and is one of only a few in the nation constructed in second empire baroque style. Conserving the integrity of the architecture of this historic building was an essential goal.

El Dorado Correctional
The facility lacked the funds to complete needed upgrades, so they turned to the Kansas Facility Conservation Improvement Program (FCIP) for help. All work needed to be completed within the challenging security environment of a correctional facility.

City of Charlottesville
The City of Charlottesville’s utility costs increased 35% in a single year. With the rising cost of energy, the city faced a potentially significant impact on budgets now and into the future.

Department of Justice
The biggest challenge ConEdison Solutions faced, through its subsidiary Custom Energy Services, was keeping a computer room used to monitor critical nation-wide operations on a 24/7 basis, consistently cool. Also, this is a historic building and all work needed to take that factor into consideration.

Hutchinson Correctional Facility
Even though Hutchinson Correctional Facility is a maximum-security prison, this project was completed in less than six months and under budget, without sacrificing client satisfaction.

Kansas Insurance Department
The Kansas Insurance Department is housed in a building that was formerly a women’s social club built in the 1920s. The building’s lighting system needed to be upgraded while retaining building aesthetics as it is listed on the National Register of Historic Places.

Lansing Correctional Facility
Lansing Correctional Facility chose to partner with ConEdison Solutions, through its subsidiary, Custom Energy Services, to address the challenges presented by rising utility costs, deferred maintenance issues, and a lack of capital budget.

Missouri State Fairgrounds
All 45 buildings received lighting upgrades and were connected to the energy management system. The energy management system allows the lighting and HVAC equipment in a building to be monitored and controlled remotely.